| Key Data Set Information | |||
| Location | DE | ||
| Reference year | 2024 | ||
| Name |
| ||
| Use advice for data set | Scope: These EPD applies to paste-like filler mortars from member companies of the Bundesverband der Gipsindustrie e.V. (Federal Association of Gypsum Industry) manufactured in Germany. All companies contributed in the course of preparing the life cycle assessment for this association EPD. Regarding transferability, the approach of a worst-case scenario for transports during supplier delivery and for the disposal of waste was applied. The data relating to the declared unit result from an average product derived from several plants with equally weighted individual data from participating manufacturers. System boundary: In the context of this EPD, the potential environmental impacts of the EPD type 'From cradle to gate with options and with the modules C1–C4 and Module D' were determined. This EPD was prepared in accordance with /DIN EN 15804/+A2 and considers the manufacturing, installation and end-of-life phase as well as the benefits and burdens beyond the system boundary. This corresponds according to /DIN EN 15804/+A2 to product phases A1–A3, C1–C4, D and the additional modules A4 and A5. For all life cycle phases all inputs (raw materials, pre-products, energy and auxiliaries) as well as the arising waste are considered. For all life cycle phases all inputs (raw materials, pre-products, energy and auxiliaries) as well as the arising waste are considered. The following production steps are considered during the manufacturing phase: * Raw material extraction * Provision of energy * Production of pre-products * Production of packaging * Transport of raw materials, pre-products, packaging, auxiliaries and operating materials * Manufacturing process * Transport of production waste to the disposal site * Waste disposal of production waste The following production steps are considered during the installation phase: * Transport from the factory gate to the construction site * Losses of construction products * Treatment of waste from product packaging and as a result of * product losses during the construction process until * complete waste treatment or until disposal of residual waste * Installation of the products into the building, including the production and transport of auxiliaries and operating materials or any energy and water use for installation or for operation on the construction site. This module also includes processing steps of the product on the construction site The following production steps are considered during the end-of-life phase: * Dismantling including deconstruction or demolition of the product from the building, including an initial sorting on the construction site * Transport of the retired product as part of waste treatment, e.g., to a recycling center, as well as the transport of the waste, e.g., to final disposal * Waste valorization (energy recovery of packaging waste) * Waste disposal including physical pre-treatment and landfill operation The life cycle phases B1–B7 (use phase) are deliberately not considered. Because the filler remains in the building on the substrate unchanged until replacement, no environmental impacts are expected during the use phase. | ||
| Technical purpose of product or process | With regard to the application on gypsum board surfaces and joints, the manufacturer's instructions should be observed depending on the edge profile of the gypsum boards, any recommendation to use reinforcement strips, and the respective desired quality level. Paste-like spackling compounds should only be applied at temperatures above +5 °C. | ||
| Classification |
Class name
:
Hierarchy level
| ||
| General comment on data set | Paste-like putties are ready-to-use, manual and, if necessary, also machine-processable filling and finishing putties according to /DIN EN 13963/ or renovation putty according to /DIN EN 15824/ for interior use (excluding areas with elevated humidity and surfaces exposed to splash water). They can be used for joint and surface finishing on gypsum boards, gypsum fibre boards, plaster, gypsum wallboards and mineral substrates as well as other substrates specified by the manufacturer. The putties are air-drying. | ||
| Copyright | Yes | ||
| Owner of data set | |||
| Quantitative reference | |||
| Reference flow(s) |
| ||
| Time representativeness | |||
| Data set valid until | 2029 | ||
| Technological representativeness | |||
| Technology description including background system | ready-mixed compounds require a CE mark and a declaration of performance in accordance with Regulation (EU) No. 305/2011 (/CPR/). Performance values of the product are according to the declaration of performance in relation to its essential characteristics according to /DIN EN 13963/ or /DIN EN 15824/ declared | ||
| Subtype | average dataset | ||||
| LCA methodology report | |||||
| Data sources, treatment and representativeness | |||||
| Documentation of data quality management | |||||
| Data source(s) used for this data set | |||||
| Completeness | |||||
| Validation | |||||
| |||||
| Compliance Declarations | |||||
| Compliance |
Compliance system name
|
Approval of overall compliance
|
Nomenclature compliance
|
Methodological compliance
|
Review compliance
|
Documentation compliance
|
Quality compliance
|
| Compliance |
Compliance system name
|
Approval of overall compliance
|
Nomenclature compliance
|
Methodological compliance
|
Review compliance
|
Documentation compliance
|
Quality compliance
|
| Commissioner and goal | |
| Commissioner of data set | |
| Data generator | |
| Data set generator / modeller | |
| Data entry by | |
| Time stamp (last saved) | 2024-02-13T00:00:00 |
| Data set format(s) | |
| Publication and ownership | |
| UUID | e3bdc61f-82ba-4329-a46d-6237e745bf11 |
| Date of last revision | 2024-02-13T10:42:00+01:00 |
| Data set version | 00.02.001 |
| Registration authority | |
| Registration number | EPD-BVG-20230454-IBG1-DE |
| Owner of data set | |
| Copyright | Yes |
| License type | Free of charge for all users and uses |
| Access and use restrictions | None |
Indicators of life cycle